Back to overview
Bridge construction

Loftesnes Bridge

Sogn og Fjordane, Norway / 11.2015 - 07.2018

Completed in June 2018, a modern steel and concrete structure has replaced the old 1950s bridge spanning the Sogndal fjord. As part of route Rv. 5 in Sogndal, the structure comprises a roundabout as well as cycle lanes and footpaths.

Photo: View of the bridge from below with the two pile heads in the fjord; in the right of the image is an embankment with meadows, a fog-shrouded forest and a few houses.
© PNC

Facts & Figures


Company

PNC Norge Infrastructure and JV Partner KA. Aurstad

Type

Bridge construction

Runtime

11.2015 - 07.2018

Principal
Statens vegvesen Region West

A new landmark crossing the Sogndal fjord

The Loftesnes Bridge is 194m long and is composed of a 15m-tall steel arch with an 80m span. The bridge is supported by four pillars: two buttresses and two pile heads embedded in the fjord. The steel framework was manufactured in Poland and transported by sea before being lifted into position by a floating crane with a bearing capacity of 800t.

Further Facts
Loftesnes Bridge