Rugtvedt – Dørdal
Stathelle, Vestfold and Telemark, Norway / 06.2017 - 06.2019
The 16.5km long four-lane stretch from Rugtvedt to Dørdal is a motorway project in Vestfold and Telemark county. The contract was concluded according to the Best Value Procurement method and was signed in May 2017 between Nye Veier and Hæhre Entreprenør AS. As a subcontractor, PNC Norge AS was responsible for the design and the execution of all 24 concrete structures on the project.
The scope of delivery included eight double T-bridges in lengths from 40m to 198m; a one-piece box bridge of 316m, seven transition bridges,
Facts & Figures
Company
PNC Norge AS
Type
Bridge construction
Runtime
06.2017 - 06.2019
Constructions along the highway
The scope of supply included eight bridges with double-T cross-sections ranging in length from 40 to 198 m, a single-piece box girder bridge measuring 316 m, seven connecting bridges, five underpasses and three culverts. The client's project achieved an Excellent rating from CEEQUAL, which is the second-best rating possible. It was the first time in Norway that an entire project, from planning to completion, had been certified according to the CEEQUAL methodology. The measures taken during the construction phase contributed to a significant reduction in greenhouse gases, improved resilience to changes in greenhouse gases and ensured a good supply to third parties and the local community.