Back to overview
Bridge construction

Rugtvedt – Dørdal

Stathelle, Vestfold and Telemark, Norway / 06.2017 - 06.2019

The 16.5km long four-lane stretch from Rugtvedt to Dørdal is a motorway project in Vestfold and Telemark county. The contract was concluded according to the Best Value Procurement method and was signed in May 2017 between Nye Veier and Hæhre Entreprenør AS. As a subcontractor, PNC Norge AS was responsible for the design and the execution of all 24 concrete structures on the project.

The scope of delivery included eight double T-bridges in lengths from 40m to 198m; a one-piece box bridge of 316m, seven transition bridges,

Aerial photo: traffic junction consisting of newly built bridges, roundabouts and a tunnel on the outskirts of a city, water surfaces and mountains on the right and in the back.
© PNC

Facts & Figures


Company

PNC Norge AS

Type

Bridge construction

Runtime

06.2017 - 06.2019

Principal
Hæhre entreprenør for Nye Veier

Constructions along the highway

The scope of supply included eight bridges with double-T cross-sections ranging in length from 40 to 198 m, a single-piece box girder bridge measuring 316 m, seven connecting bridges, five underpasses and three culverts. The client's project achieved an Excellent rating from CEEQUAL, which is the second-best rating possible. It was the first time in Norway that an entire project, from planning to completion, had been certified according to the CEEQUAL methodology. The measures taken during the construction phase contributed to a significant reduction in greenhouse gases, improved resilience to changes in greenhouse gases and ensured a good supply to third parties and the local community.

What ultimately counts in the construction business is successfully completed projects. PORR has many of these.